Skip to main content
Pumping Plant

CLPE Wins Bid for Windy Gap Electrical Study and Design

June 5, 2023

CLP Engineering, LLC (CLPE) has been awarded a contract to conduct engineering studies and electrical system upgrades design for the pumping plant at the Windy Gap Reservoir in Grand County, Colorado. The pumping plant, owned and operated by Northern Colorado Water Conservancy District, diverts approximately 48,000 acre-feet water per year from the Colorado River to Lake Granby and then over the mountains to the Front Range.

The pumping plant was constructed in the mid-1980s and consists of four Hitachi 12,000 horsepower pumps at 13.8 kilovolts. Up to four pumps can run simultaneously if adequate runoffs is availiable.

CLPE is excited to be working with Northern Colorado Water on this project!

Privacy Policy

We collect information about you through cookies. Click here for our Privacy Policy.

About

We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.